Traffic & Transit
Wilton Road Paving Status – August 18
The following roads are part of the proposed Paving program.
Press release from the Town of Wilton:
August 19, 2020
The following roads are part of the proposed Paving program.
Find out what's happening in Wiltonfor free with the latest updates from Patch.
Roads under "Roads in Progress" column indicates that drainage improvements began, and milling/paving will follow. Road surfaces on these prepped roads may have raised structures until it is paved. Please travel on these roads with caution.
Roads under "Roads to be Scheduled" column indicates that work has not started, but are proposed to be included in this year's paving program, weather permitting.
Find out what's happening in Wiltonfor free with the latest updates from Patch.
The Town of Wilton will provide updates. Please continue to monitor the updates through the Town's website. Please contact Department of Public Works at (203) 563-0152 for further information.
IMPORTANT: The paving schedule may vary due to inclement weather.
Roads In Progress:
Nod Hill Rd (partial)
(Ridgefield Town line to Whipstick)
Cannon Rd (Partial)
(Sturges Ridge to Weston Line)
Chipmunk Ln
Coley Road
Roads Paved:
Bayberry Lane
Belden Hill Lane
Beldon Hill Rd N (partial)
(Ridgefield Rd to Belden Hill Lane)
Bhasking Ridge Rd
Black Birch Dr
Brandon Cr
Cannon Rod (Partial)
(Pimpewaug to Sturges Ridge)
Cider Mill Place
English Drive
Freshwater Lane
Gaylord Drive (S)
Glen Hill Ln
Glen Hill Rd
Graenest Ridge Road
Granite Dr
Ground Pine Road
Hemmelskamp Rd
Henry Austin Dr
Hidden Lake Ridge
Highview Drive
Hollow Tree Pl
Juniper Place
Kristine Lilly Way (Parital)
Ledgewood Dr
Mather St
New St 1
New St 2
New St Terrace
Oak Ledge Lane
Orchard Dr
Pheasant Run Rd
Raymond Lane
Rockhouse Rd
Salem Rd
Springbrook Ln
School Rd (Partial)
Scribner Hill Rd
Stonecrop La
Sunset Hill Rd
Surrey Glen
Thunder Lake Rd (Partial)
Walnut Place
Washington Post Dr
Wildwood Drive
Woodchuck Lane
Woodhill Rd
Wren Thicket
2 Week Look Ahead
Starting week of August 17th, 2020 - The Towns paving subcontractor will be primarily working on performing incidental work on various recently paved roads.
It is anticpated that once tree removal and electrical work are completed on Coley Road, contractor will pave shortly thereafter.
This press release was produced by the Town of Wilton. The views expressed here are the author's own.