Traffic & Transit
Lane And Ramp Closures Underway As Final Preparations For Phase One Traffic Pattern In City Of Wilmington
Motorists are encouraged to use alternate routes such as SR 2, SR 141, I-495 or US 13 to reach their destination.
February 25, 2021
Find out what's happening in Wilmingtonfor free with the latest updates from Patch.
The Delaware Department of Transportation (DelDOT) announces to motorists that the final preparations to shift traffic to the I-95 Rehabilitation Phase 1 traffic pattern will require various closures on I-95 Northbound through Wilmington beginning tonight and continuing through Saturday, February 27.
Motorists are encouraged to use alternate routes such as SR 2, SR 141, I-495 or US 13 to reach their destination. For additional information for the I-95 Corridor Project, visit www.restorethecorridor.com and sign up for daily project information to be sent to your cell phone, or call 1-800-652-5600.
Find out what's happening in Wilmingtonfor free with the latest updates from Patch.
TIMES AND DATES:
Thursday, February 25, 10 PM until 5 AM Friday, February 26
• FULL CLOSURE, I-95 NB from the I-495 Split to US 202 Interchange
• CLOSED, Martin Luther King Boulevard WB to I-95 NB & SB
Friday, February 26, 5 AM until 10 PM:
• REDUCED LANE CAPACITY, I-95 NB from I-495 Split to US 202 Interchange
• OPEN, Exit 6 I-95 NB off-ramp to MLK Boulevard
• OPEN, Exit 7 I-95 NB off-ramp to Delaware Avenue
• OPEN, 10th St./Adams St. on-ramp to I-95 NB
• OPEN, Adams St./Delaware Ave. on-ramp to I-95NB
Friday, February 26, 10 PM until 6 AM Saturday, February 27
• FULL CLOSURE, I-95 NB between I-495 Split and US 202 Interchange
• CLOSED, Exit 6 I-95 NB off-ramp to MLK Boulevard
• CLOSED, Exit 7 I-95 NB off-ramp to Delaware Avenue
• CLOSED, 10th St./Adams St. I-95 NB on-ramp (see Detour to I-95N on-ramp at Delaware Ave/Adams St. below)
• OPEN, Adams St./ Delaware Ave. on-ramp to I-95 NB
Saturday, February 27, 6 AM:
• I-95 NB AND SB TRAFFIC IN ‘CONTRA-FLOW’ PHASE 1 TRAFFIC PATTERN (reduced lanes I-95 NB and SB)
• OPEN – All I-95 Southbound On- and Off-Ramps
• OPEN – “New” I-95 NB Exit to MLK Boulevard Eastbound
• OPEN – I-95 NB On-Ramp from Delaware Ave./Adams St. (adjustments to the ramp alignment to be done at a later date)
Detour signage will be posted. Motorists traveling through Delaware will be directed to use I-495 NB, motorists going into Wilmington will be directed to use I-495 NB to Exit 1, US 13 N, and motorists heading to US 202 will be directed to use I-95 NB to Exit 5B, SR 141 NB.
This press release was produced by the City of Wilmington. The views expressed here are the author’s own.