Politics & Government
Site Plans For Proposed Cheshire Bridge Road Sewer Tank Now Available
Plans now available online for the proposed 10-million gallon tank off Cheshire Bridge Road

Plans for the proposed sewer tank and pumping station off Cheshire Bridge Road are now available to the public online.
The city of Atlanta Department of Watershed Management plans to build one 10-million gallon, raised overflow tank off Cheshire Bridge Road at 2061 Liddell Drive.
The tank would be about 55 feet tall and 185 feet wide, with a pumping station and electrical station on the flood plain at 2001 Cheshire Bridge Rd., near the north end of Lenox Road.
Find out what's happening in Virginia Highland-Druid Hillsfor free with the latest updates from Patch.
Plans call for tunneling diluted sewage overflow under Cheshire Bridge Road to the Liddell Road tank when the main system is overcapacity, which is usually about once a month, EDT Waterworks principal engineer Donald Fry told resudents
Construction is expected to start in December 2012 and be completed in May 2014.
Find out what's happening in Virginia Highland-Druid Hillsfor free with the latest updates from Patch.
Make sure to click through the PDF documents uploaded above to see the full plans for the project.
What’s your take on the project plans? Are there details missing you’d like to see? Tell us in the comments.
Come join the rest of the VaHi-Druid Hills Patch fans on Facebook! It's Patch and Facebook together. Doesn't get much better than that.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.