Traffic & Transit

Hopkins Street Bridge Closure On August 21

Hopkins Street, between Tarrant Lane and Brook Street, will have no through-traffic during this time.

August 19, 2020

The Massachusetts Department of Transportation will be applying pavement markings on the Hopkins Street Bridge from approximately 7 a.m. through 3 p.m. on Friday, August 21.

Find out what's happening in Wakefieldfor free with the latest updates from Patch.

Hopkins Street, between Tarrant Lane and Brook Street, will have no through-traffic during this time. Residential access will be permitted north of the bridge through Tarrant Lane and south of the bridge through Brook Street. Traffic across the bridge will be granted for emergency access only.

Normal traffic operations will resume after 3 p.m.

Find out what's happening in Wakefieldfor free with the latest updates from Patch.

Bridge Deck Replacement and Related Work (Including Painting) Br. No. W-01-021MassDOT Contract #102203


This press release was produced by the Town of Wakefield. The views expressed here are the author’s own.

More from Wakefield