Traffic & Transit

MassDOT To Conduct Guardrail Repairs On Route 3 In Plymouth

The work will begin Tuesday, June 8 at 8 p.m. and continue until Wednesday, June 9 at 4 a.m.

PLYMOUTH, MA — The Massachusetts Department of Transportation (MassDOT) will be conducting emergency guardrail repairs on a section of Route 3 southbound in Plymouth beginning Tuesday, June 8 at 8 p.m. and continuing until Wednesday, June 9 at 4 a.m.

The work will take place between Exits 15 and 15 at mile marker 15.4 and will require the temporary closure of the right travel and break down lanes.

Traffic control measures, including police details, will be required during construction. Drivers should expect delays, reduce speed, and use caution.

Find out what's happening in Plymouthfor free with the latest updates from Patch.

For traffic updates, MassDOT encourages travelers to do the following:

  • Dial 511 before heading out onto the roadways and select a route to hear real-time conditions.
  • Visit www.mass511.com, a website which provides real-time traffic and incident advisory information, access to traffic cameras, and allows users to subscribe to text and email alerts for traffic conditions.
  • Follow MassDOT on Twitter @MassDOT to receive regular updates on road and traffic conditions.
  • Download MassDOT's GoTime mobile app and view real-time traffic conditions before setting out on the road
  • Find out what's happening in Plymouthfor free with the latest updates from Patch.

    Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

    More from Plymouth