Politics & Government
Nighttime Closures Scheduled for Eastbound SR 18 Over Green River Bridge this Weekend
Eastbound State Route 18 Green River (Neely) Bridge will be closed overnight on Friday, Aug. 16, and Saturday, Aug. 17, for expansion joint replacement work.

Information from the Washington State Department of TransportationÂ
SEATTLE – Contractor crews working for the Washington State Department of Transportation will close the eastbound State Route 18 Green River (Neely) Bridge overnight on Friday, Aug. 16, and Saturday, Aug. 17, for expansion joint replacement work.
Closure details
Find out what's happening in Bonney Lake-Sumnerfor free with the latest updates from Patch.
Friday, Aug. 16
Eastbound SR 18 between Southeast Auburn Black Diamond Road and Southeast 304th Street will be closed from 11:59 p.m. Friday until 6 a.m. Saturday. The left lane will close at 10 p.m. to allow crews room to mobilize equipment.
Find out what's happening in Bonney Lake-Sumnerfor free with the latest updates from Patch.
Saturday, Aug. 17
Eastbound SR 18 between Southeast Auburn Black Diamond Road and Southeast 304th Street will be closed from 11 p.m. Saturday until 8 a.m. Sunday. The left lane will close at 9 p.m. to allow crews room to mobilize equipment.
This work is part of the SR 99 to SR 18 Green River Paving Project. For the most up-to-date closure details, please visit our construction updates website.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.