Traffic & Transit
Stillwater Lift Bridge 2018: New Schedule Details
Later this summer, span six will be floated out of its current location to provide a new opening for boats to use during repairs.

STILLWATER, MN — With the return of warm weather, the Stillwater Lift Bridge schedule will resume at 8 a.m. on Tuesday, May 15. The schedule was changed this year following a test revision last summer by the U.S. Coast Guard along with comments from the public.
The bridge will be staffed full time from 8 a.m. to 12 midnight seven days a week until the end of the year’s schedule, sometime around Oct. 15.
MnDOT will respond to special openings after 12 midnight every day on a two-hour notice basis. Boaters must call MnDOT at (651) 234-7110 a minimum of two hours in advance to schedule a bridge lift outside the regularly scheduled lifts.
Find out what's happening in Stillwaterfor free with the latest updates from Patch.
Any requests received by marine radio will be relayed by the bridge tender to the dispatcher.
During the periods of the day when the bridge is staffed, bridge tenders will monitor channel 16 on the marine band radio. Upon receiving a call on channel 16, conversations will be switched to channel 14.
Find out what's happening in Stillwaterfor free with the latest updates from Patch.
During rehabilitation of the Stillwater Lift bridge, efforts will be made to minimize impacts to river traffic during the navigation season.
Later this summer, span six, which is located east of the lift bridge span, will be floated out of its current location to provide an opening for boats to use while the lift bridge span is being repaired.
Image via Google Streetview
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.