The town was advising drivers to see an alternate route.
A brief but powerful storm swept across Massachusetts Wednesday night, causing lots of damage in Wayland.
The first part of a rebuild of a bridge connecting Wayland and Sudbury wrapped up on Wednesday.
The Route 27 bridge over the Sudbury River needs to be rebuilt due to structural problems, according to the town.
Shuttles serving Natick, Wayland, and Sudbury will stop running starting next week, according to MWRTA.
The westbound detour will be in place during nighttime hours through April during a water main replacement project.
Traffic will be detoured around a two-mile stretch of Route 20 between Wayland and Sudbury.
Wicked weather brought down trees and branches all over town.
The bridge will be closed from 9 a.m. to 3:30 p.m.
Work on Route 27 was too disruptive during the daytime hours. The town has moved it to overnight.